Work That Speaks for Itself

We’ve worked on everything from data centers to candy factories — and we’re just as proud of the small rigging jobs as the headline-stealing ones. No matter the job, our focus is always the same: Do it right and finish strong.

Featured Project


Riverfront Park Amphitheater
Lynchburg, VA

Two years of planning, one incredible lift. CSE Inc. was proud to handle rigging, lifting, and flagging for the new $8 million Riverfront Park amphitheater arch in downtown Lynchburg. The amphitheater is a key initiative in Lynchburg’s Downtown 2040 revitalization plan.

Equipment:
  • Link-Belt 210-Ton All Terrain Craine
  • Link-Belt 110-Ton Telescopic Truck Crane

Project Partners:
  • Jamerson-Lewis Construction
  • Shickels Corporation

Recent Projects


Bridge Removal Oak Ridge Bridge Nelson County, VA

CSE, Inc. removed the Oak Ridge Bridge, a fixture in Nelson County since 1882, so that a modern bridge could be installed. Utilizing two cranes, our team lifted and removed this historic Pratt through truss bridge, once a pivotal railroad and then highway bridge. This removal marks the end of an era for a structure that has been a vital part of the Oak Ridge historic district for over a century. At CSE, Inc. we’re proud to ensure the safety and continuity of our community’s infrastructure.


HVAC Unit Removal/Replacement Georgia-Pacific Paper Mill Big Island, VA

At the historic Georgia-Pacific Big Island Mill—the oldest business in Bedford County—CSE, Inc. provided precision rigging support for the removal and replacement of a 3,500-pound HVAC unit by helicopter.


Sugar Pipe Replacement Hershey’s Stuarts Draft Plant Stuarts Draft, VA

With speed, precision, and the help of two cranes, CSE, Inc. executed the removal and replacement of a crucial pipe system at Hershey’s candy manufacturing plant in the Shenandoah Valley. This system is key for transporting granulated sugar directly into the production line, ensuring a seamless flow of raw materials. With precision, one crane lifted our specialists in a man basket for intricate work, while the other managed the heavy lifting of the pipes from their complex positions around the silos.


Pump and Pipe Setting College Lake Dam Lynchburg, VA

Our skilled team used our crane to set new pumps and pipes at the site of the College Lake Dam, helping to resolve flooding risks. This work is part of the College Lake Dam Removal Project by the City of Lynchburg and the University of Lynchburg. Their vision is to remove the high-hazard dam and restore the resulting lakebed to a thriving environment where Blackwater Creek can re-emerge after more than eight decades.

Specialized Expertise You Can Rely On

In nearly six decades, CSE, Inc. has worked with clients in nearly every industry:

  • Pharmaceutical
  • Manufacturing
  • Commercial
  • Institutional
  • Rail/Freight
  • Food Production & Processing
  • Chemical
  • Energy & Power
  • Pulp Paper
  • Nuclear
  • Petroleum/Gas
  • Steel and Mining

Our Equipment

We operate one of the largest and most specialized fleets of cranes and rigging equipment on the East Coast. From gantry systems and all-terrain cranes to custom rigging gear, our inventory is built for precision and power. Every piece of gear we own helps us do one thing better: finish the job when others can’t.