Sugar Pipe Replacement
Hershey’s Stuarts Draft Plant
Stuarts Draft, VA
With speed, precision, and the help of two cranes, CSE, Inc. executed the removal and replacement of a crucial pipe system at Hershey’s candy manufacturing plant in the Shenandoah Valley. This system is key for transporting granulated sugar directly into the production line, ensuring a seamless flow of raw materials. With precision, one crane lifted our specialists in a man basket for intricate work, while the other managed the heavy lifting of the pipes from their complex positions around the silos.